About block 879,219
Bitcoin block 879,219 was mined by SBI Crypto on January 14, 2025 at 12:46 PM UTC, 4 seconds after block 879,218. That is faster than the 10-minute average the network aims for: blocks come in bursts because finding one is pure chance.
It confirmed 1,150 transactions in 1.56 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 2.00 sat/vB, down from 3.00 sat/vB in the block before, and all fees added up to 0.0194 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1444 BTC for this block.
Block 879,219 is number 244 of 2,016 in difficulty epoch 436; 1,772 blocks remain until the next difficulty adjustment at block 880,991. The next halving is at block 1,050,000, 170,781 blocks after this one.
Its hash starts with 19 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 98,495 confirmations, so it is settled beyond any practical doubt.