About block 886,628
Bitcoin block 886,628 was mined by SBI Crypto on March 6, 2025 at 9:15 PM UTC, 3 min 4 s after block 886,627. That is faster than the 10-minute average the network aims for: blocks come in bursts because finding one is pure chance.
It confirmed 1,225 transactions in 1.20 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 2.00 sat/vB, up from 2.00 sat/vB in the block before, and all fees added up to 0.0251 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1501 BTC for this block.
Block 886,628 is number 1,605 of 2,016 in difficulty epoch 439; 411 blocks remain until the next difficulty adjustment at block 887,039. The next halving is at block 1,050,000, 163,372 blocks after this one.
Its hash starts with 19 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 90,464 confirmations, so it is settled beyond any practical doubt.