About block 904,518
Bitcoin block 904,518 was mined by AntPool on July 7, 2025 at 11:24 PM UTC, 5 min 13 s after block 904,517. That is faster than the 10-minute average the network aims for: blocks come in bursts because finding one is pure chance.
It confirmed 4,125 transactions in 1.53 MB (99.9% of the 4 million weight-unit limit). The median transaction paid 4.00 sat/vB, down from 6.00 sat/vB in the block before, and all fees added up to 0.0490 BTC. With the 3.125 BTC subsidy of halving era 5, AntPool earned 3.1740 BTC for this block.
Block 904,518 is number 1,351 of 2,016 in difficulty epoch 448; 665 blocks remain until the next difficulty adjustment at block 905,183. The next halving is at block 1,050,000, 145,482 blocks after this one.
Its hash starts with 20 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. AntPool found 200 blocks in the week before. Today the block has 70,990 confirmations, so it is settled beyond any practical doubt.