About block 905,123
Bitcoin block 905,123 was mined by SBI Crypto on July 11, 2025 at 8:06 PM UTC, 11 min 7 s after block 905,122. That is slower than the 10-minute target; long gaps are normal, since every hash attempt is an independent draw with the same tiny chance.
It confirmed 2,846 transactions in 1.68 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 2.00 sat/vB, up from 2.00 sat/vB in the block before, and all fees added up to 0.0369 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1619 BTC for this block.
Block 905,123 is number 1,956 of 2,016 in difficulty epoch 448; 60 blocks remain until the next difficulty adjustment at block 905,183. The next halving is at block 1,050,000, 144,877 blocks after this one.
Its hash starts with 19 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 70,337 confirmations, so it is settled beyond any practical doubt.