About block 910,338
Bitcoin block 910,338 was mined by RedRock Pool on August 16, 2025 at 6:08 PM UTC, 2 seconds after block 910,337. That is faster than the 10-minute average the network aims for: blocks come in bursts because finding one is pure chance.
It confirmed 88 transactions in 2.18 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 0.00 sat/vB, and all fees added up to 0.0031 BTC. With the 3.125 BTC subsidy of halving era 5, RedRock Pool earned 3.1281 BTC for this block.
Block 910,338 is number 1,123 of 2,016 in difficulty epoch 451; 893 blocks remain until the next difficulty adjustment at block 911,231. The next halving is at block 1,050,000, 139,662 blocks after this one.
Its hash starts with 20 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. RedRock Pool found 0 blocks in the week before. Today the block has 64,144 confirmations, so it is settled beyond any practical doubt.