About block 910,480
Bitcoin block 910,480 was mined by SBI Crypto on August 17, 2025 at 5:27 PM UTC, 35 min 52 s after block 910,479. That is slower than the 10-minute target; long gaps are normal, since every hash attempt is an independent draw with the same tiny chance.
It confirmed 4,394 transactions in 1.55 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 3.00 sat/vB, up from 1.00 sat/vB in the block before, and all fees added up to 0.0473 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1723 BTC for this block.
Block 910,480 is number 1,265 of 2,016 in difficulty epoch 451; 751 blocks remain until the next difficulty adjustment at block 911,231. The next halving is at block 1,050,000, 139,520 blocks after this one.
Its hash starts with 19 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 63,941 confirmations, so it is settled beyond any practical doubt.