About block 910,895
Bitcoin block 910,895 was mined by SBI Crypto on August 20, 2025 at 2:43 PM UTC, 8 min 50 s after block 910,894. That is faster than the 10-minute average the network aims for: blocks come in bursts because finding one is pure chance.
It confirmed 2,416 transactions in 1.22 MB (76.0% of the 4 million weight-unit limit). The median transaction paid 1.00 sat/vB, and all fees added up to 0.0188 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1438 BTC for this block.
Block 910,895 is number 1,680 of 2,016 in difficulty epoch 451; 336 blocks remain until the next difficulty adjustment at block 911,231. The next halving is at block 1,050,000, 139,105 blocks after this one.
Its hash starts with 19 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 63,339 confirmations, so it is settled beyond any practical doubt.