About block 914,239
Bitcoin block 914,239 was mined by SBI Crypto on September 11, 2025 at 2:01 PM UTC, 11 min 13 s after block 914,238. That is slower than the 10-minute target; long gaps are normal, since every hash attempt is an independent draw with the same tiny chance.
It confirmed 3,001 transactions in 1.63 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 2.00 sat/vB, up from 2.00 sat/vB in the block before, and all fees added up to 0.0314 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1564 BTC for this block.
Block 914,239 is number 992 of 2,016 in difficulty epoch 453; 1,024 blocks remain until the next difficulty adjustment at block 915,263. The next halving is at block 1,050,000, 135,761 blocks after this one.
Its hash starts with 19 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 59,520 confirmations, so it is settled beyond any practical doubt.