About block 926,749
Bitcoin block 926,749 was mined by SBI Crypto on December 7, 2025 at 1:04 AM UTC, 18 min 21 s after block 926,748. That is slower than the 10-minute target; long gaps are normal, since every hash attempt is an independent draw with the same tiny chance.
It confirmed 2,986 transactions in 1.56 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 2.00 sat/vB, up from 2.00 sat/vB in the block before, and all fees added up to 0.0239 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1489 BTC for this block.
Block 926,749 is number 1,406 of 2,016 in difficulty epoch 459; 610 blocks remain until the next difficulty adjustment at block 927,359. The next halving is at block 1,050,000, 123,251 blocks after this one.
Its hash starts with 20 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 46,742 confirmations, so it is settled beyond any practical doubt.