About block 928,263
Bitcoin block 928,263 was mined by SBI Crypto on December 17, 2025 at 11:49 AM UTC, 30 min 34 s after block 928,262. That is slower than the 10-minute target; long gaps are normal, since every hash attempt is an independent draw with the same tiny chance.
It confirmed 4,054 transactions in 1.56 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 2.00 sat/vB, and all fees added up to 0.0400 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1650 BTC for this block.
Block 928,263 is number 904 of 2,016 in difficulty epoch 460; 1,112 blocks remain until the next difficulty adjustment at block 929,375. The next halving is at block 1,050,000, 121,737 blocks after this one.
Its hash starts with 19 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 45,903 confirmations, so it is settled beyond any practical doubt.