About block 935,843
Bitcoin block 935,843 was mined by SBI Crypto on February 10, 2026 at 3:00 AM UTC, 1 min 55 s after block 935,842. That is faster than the 10-minute average the network aims for: blocks come in bursts because finding one is pure chance.
It confirmed 522 transactions in 0.30 MB (22.6% of the 4 million weight-unit limit). The median transaction paid 0.00 sat/vB, down from 1.00 sat/vB in the block before, and all fees added up to 0.0044 BTC. With the 3.125 BTC subsidy of halving era 5, SBI Crypto earned 3.1294 BTC for this block.
Block 935,843 is number 420 of 2,016 in difficulty epoch 464; 1,596 blocks remain until the next difficulty adjustment at block 937,439. The next halving is at block 1,050,000, 114,157 blocks after this one.
Its hash starts with 20 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. SBI Crypto found 0 blocks in the week before. Today the block has 39,685 confirmations, so it is settled beyond any practical doubt.