About block 942,063
Bitcoin block 942,063 was mined by AntPool on March 24, 2026 at 10:52 PM UTC, 12 min 38 s after block 942,062. That is slower than the 10-minute target; long gaps are normal, since every hash attempt is an independent draw with the same tiny chance.
It confirmed 4,105 transactions in 1.89 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 1.00 sat/vB, up from 1.00 sat/vB in the block before, and all fees added up to 0.0215 BTC. With the 3.125 BTC subsidy of halving era 5, AntPool earned 3.1465 BTC for this block.
Block 942,063 is number 592 of 2,016 in difficulty epoch 467; 1,424 blocks remain until the next difficulty adjustment at block 943,487. The next halving is at block 1,050,000, 107,937 blocks after this one.
Its hash starts with 20 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. AntPool found 205 blocks in the week before. Today the block has 34,125 confirmations, so it is settled beyond any practical doubt.