About block 954,695
Bitcoin block 954,695 was mined by AntPool on June 21, 2026 at 12:01 PM UTC, 10 min 1 s after block 954,694. That is slower than the 10-minute target; long gaps are normal, since every hash attempt is an independent draw with the same tiny chance.
It confirmed 5,124 transactions in 1.59 MB (99.8% of the 4 million weight-unit limit). The median transaction paid 1.00 sat/vB, up from 1.00 sat/vB in the block before, and all fees added up to 0.0170 BTC. With the 3.125 BTC subsidy of halving era 5, AntPool earned 3.1420 BTC for this block.
Block 954,695 is number 1,128 of 2,016 in difficulty epoch 473; 888 blocks remain until the next difficulty adjustment at block 955,583. The next halving is at block 1,050,000, 95,305 blocks after this one.
Its hash starts with 20 zeros: that is the proof of work, a number below the target that the whole network’s hashrate had to search for. AntPool found 185 blocks in the week before. Today the block has 20,407 confirmations, so it is settled beyond any practical doubt.